Work has begun adding a fourth geotextile container to the pile already there and adding returns to the ends of the geotextile containers. These photos were taken on a quick trip in the rain. More to come as work progresses.

As usual – more and larger photos on Nantucket Erosion

_MG_6283

A trench dug to the south of the existing structrue.

_MG_6323

On the north end of the structure, pipe is brought in by an excavator.

Leave a Reply

Your email address will not be published. Required fields are marked *

Set your Twitter account name in your settings to use the TwitterBar Section.