Work on the fourth geotextile container installation is in the preparation stage with sand being delivered to the beach, a large water pit dug and pipes laid out the length of the tubes to bring water from the pit to the hopper where it is mixed with sand that makes the slurry that is injected into the geotextile containers.

As usual – more and larger photos on Nantucket Erosion

_MG_6394

_MG_6361

_MG_6472

_MG_6524

_MG_6508

Leave a Reply

Your email address will not be published. Required fields are marked *

Set your Twitter account name in your settings to use the TwitterBar Section.